Renovation and extension
of a swimming pool
Project
Renovation of a swimming pool and extension of a combined pool with an additional swimmer’s pool during ongoing operation
Project type
Refurbishment and Reconstruction
Client
Swimming pool company
Location
Baden-Württemberg
As part of a complex construction project, a swimming pool in Baden-Württemberg was renovated and extended to create a modern and energy-saving swimming pool. A 25-metre swimming pool with a convertible roof and partially openable walls was newly built as a combined pool, while the infrastructure with changing areas and catering zones was comprehensively modernized. The entire pool water technology was renewed and brought up to the latest technical standards. The measures were carried out in two construction phases while the pool was in operation, ensuring full functionality at all times.
A training and therapy pool with a raised floor was also built. The foyer was significantly upgraded with an open reception desk and a transparent entrance front. New office and seminar rooms were also created by adding a storey to the building.
THOST took over the Project Controlling according to German engineering standards, project stages 1 to 5 in the action areas A to E and ensured that all project goals were achieved on time, cost-efficiently and in high quality.
Our Services
We manage your project
Are you planning a similar project and want to benefit from our expertise? We will be happy to assist you in developing your potential and turning your visions into reality.